Infrastructure & Lab

Sr.No.Name of LaboratorySubject Name of Practical ConductedLab InvestmentLab Incharge Name
01Concrete TechnologyConcrete Technology1,92,782/-Mr.S.M.Chougule
02Mechanics of Stru ctureMechanics of Structure8,60,285/-Mr.M.B.Chougule
03Geotechnical Engg.Geotechnical Engg.1,01,323/-Mr.R.A.Kanire
04SurveyingSurveying1,13,550/-Mr.P.S.Redekar
05Advanced SurveyingAdvanced Surveying4,70,244/-Mr.P.S.Redekar
06Public Health Engg.Public Health Engg1,32,660/-Mr.M.S.Shingade
07Applied MechanicsApplied Mechanics1,32,168/-Mr.M.B.Chougule
08HydraulicsHydraulics265300/-Mr.A.T.Halade
09Highway Engg.Highway Engg.31,585/-Mr.A.T.Halade
10Computer Aided DraftingComputer Aided Drafting739500/-Mr.M.S.Shingade

CTE Lab

EGM Lab

Instrument Cost & Quantity

Instrument Cost & Quantity